|
|
DATA LUAS KAVLING SIAP JUAL 2010
|
| NO. |
BLOK |
UKURAN (L X P) |
LUAS (M2) |
| 1 |
E 11 a |
|
3,840 |
| 2 |
E 11 b |
|
2,997 |
| 3 |
E 11 c |
|
2,663 |
| 4 |
E 12 a |
33 x 66 |
2,178 |
| 5 |
E 12 b |
32 x 66 |
2,112 |
| 6 |
E 12 c |
49.5 x 59 |
2,920.5 |
| TOTAL KAV E |
16,710.50 |
| 3 |
F 14 a |
73.5 x 142 |
10,347 |
| 4 |
F 14 b |
73.5 x 142 |
10,347 |
| 5 |
F 15 a |
38 x 71 |
2,698 |
| 6 |
F 15 b |
52 x 71 |
3,692 |
| 7 |
F 15 c |
61 x 71 |
4,331 |
| 8 |
F 15 d |
63 x 55 |
3,465 |
| TOTAL KAV F |
34, 880 |
| 17 |
H 4 a |
(31 x 107) + ( 24.5 x 18.5) |
4,225.25 |
| 18 |
H 4 b |
(33 x 91) + 1/2 (33X 16) |
3,492 |
| TOTAL KAV H |
7,717.25 |
| 22 |
J3 |
|
3,564 |
| 23 |
J4 |
47 X 92 |
4,324 |
| 24 |
J5 |
|
12,365 |
| 25 |
J6 |
|
4,890 |
| 26 |
J7 |
47 X 88 |
4,136 |
| 27 |
J8 |
|
7,368 |
| 28 |
J9 |
61 X 99 |
6,039 |
| TOTAL KAV J |
42,686 |
| TOTAL KAV SIAP BANGUN 2010 |
101,993.75 |
| KAVLING SIAP PAKAI |
| A12 |
LT = 10.024 M2
LB = 5.442,8 M2 |
| F9 |
LT = 3.920 M2
LB = 2.346 M2 |
|
 |